Project · Airport tenancy fitout
Europcar – Hobart International Airport Fitout
Full car hire tenancy fitout within the new Hobart Airport terminal. CBD Projects delivered joinery, ceilings, services and finishes on a tight program aligned with the terminal opening.
Completed fitout
Airport project
Project overview
CBD Projects delivered a full fitout for Europcar within the newly upgraded Hobart International Airport terminal, coordinating closely with airport management, consultants and other contractors on the concourse.
Scope of works
- ✔Full commercial tenancy fitout within new terminal shell.
- ✔New counters, custom joinery and back-of-house cabinetry.
- ✔Slatwall storage units and concealed storage solutions.
- ✔Metal stud framing, insulation and plasterboard linings.
- ✔New grid ceilings installed throughout the tenancy.
- ✔25 kW engineered and designed ducted air conditioning system.
- ✔Structured data and communications installed to engineered specifications.
- ✔Hybrid vinyl plank flooring throughout.
- ✔Green feature wall with Europcar branding and signage.
- ✔Coordination with airport electrical, mechanical, fire and data contractors.
Key features & outcome
The fitout balances brand visibility, durability and a clean customer experience, while integrating with the larger terminal environment.
- ✔Full-height Tasmanian landscape mural as a key visual feature.
- ✔Integrated cable management within each counter for tidy workstations.
- ✔Timber slatted feature wall concealing storage and services.
- ✔Approx. 2.5 weeks on site, aligned with terminal opening dates.
- ✔Delivered with full compliance documentation and sign-offs.
- ✔Positive feedback from Europcar with ongoing works nationally for over six years.
Project gallery
Progress and completion photos from Europcar Hobart International Airport.
